- Menara Maxis Corporate Fit Out Works For Maxis Broadband
- M&E installations at level 8 to level 25
- M&E installations for work stations in an open office plan, pantry, board rooms, lan room and manager’s office.
- M&E installations for retail centre, call centre and data centre.
- Pressurised High Power Amplifier Equipment Room For Astro Bukit Jalil
- M&E Installations Consist Of :
- Air conditioning installations (precooled dx-air handling units, precooled chiiled water air handling units, chilled water precision air cond units and mechanical ventilation system)
- Fire protection installations (sprinkler system and fire alarm system)
- Electrical installations (ups system and internal installations)
- Building management system for monitoring the room pressure & temperature and equipment controls)
- Texas Instruments Malaysia Gen-x (General Exhaust) Installation Project
- M&E Installations Consist Of :
- Mechanical ventilation installation-consolidating scubber system, dust collector and general exhaust into one common exhaust system
- Building management system/scada-monitoring the system pressure and controls
- Electrical installations for the proposed exhaust system
- Pinnacle Sunway Call Centre Fit Out Works For Maxis Broadband.
- M&E installations at level 2, 3 & 4.
- M&E installations for work stations in an open office plan, pantry, meeting rooms, lan room and manager’s offices.
- M&E installations for genset, ups and after office hours vrv air conditioning system
- Puchong Financial Corporate Centre Fit Out Works For Manulife.
- M&E installations at level 10.
- M&E installations for work stations in an open office plan, pantry, server room, board meeting rooms and manager’s offices.
- Bangsar South Call Centre Fit Out Works For Astro/Measat.
- M&E installations for work stations in an open office plan, pantry, meeting rooms and manager’s offices.
- M&E installations for call centre, data centre, genset, ups and after office hour air conditioning system.
- Gardens Midvalley Corporate Office Fit Out Works For Accenture.
- M&E installations for work stations in an open office plan, pantry, board room, lan room and manager’s offices.
- M&E installations for retail centre, call centre, executive floors, auditorium and data centre.
- USGBC leed silver certification
- Manipal Club House & Manipal Hostel Block
- M&E installations for work stations in an open office plan, pantry, board room, lan room and manager’s offices.
- M&E installations for retail centre, call centre, executive floors, auditorium and data centre.
- USGBC leed silver certification
- Texas Instruments Malaysia B2 Cafeteria And Kitchen Upgrading Works
- M&E Installations Consist Of :
- Mechanical ventilation for the kitchen hoods
- Air conditioing system for the cafetaria & kitchen
- Cold room storage installations
- Fire protection (wet-chemical & sprinkler system) installations
- Electrical installations
- Plumbing & sanitary installations (grease trap, scupper drain & hot water storage heat pump system)
- SJKC Wangsa Maju School Building & Conventional Hall
- M&E Installations Consist Of :
- Air conditioning installations (dx-split units, dx-air handling units and mechanical ventilation)
- Fire protection installations (hose reel , fire suppression system and fire alarm system)
- Plumbing & sanitary installations (external and internal installations)
- Electrical installations (electrical infrastructure and internal installations)
- Temple Of Fine Arts, Kuala Lumpur
- M&E Installations Consist Of :
- Air conditioning installations (air cooled chiller, dx-split units, dx-air handling units and mechanical ventilation)
- Fire protection installations (hose reel system, sprinkler system, fire suppression system, smoke spill system and fire alarm system)
- Plumbing & sanitary installations (external and internal installations)
- Electrical installations (electrical infrastructure, genset system and internal installations)
- Maxis Spark Klcc I-centre M&e Fit Out Works
- Mbf Printing Factory (Food Grade) At Kota Kemuning, Shah Alam
- M&E Installations Consist Of :
- Air conditioning installations (precooled dx-air handling units, water cooled pacakaged units air handling units c/w cooling towers, water treatment system, dx-split units and mechanical ventilation system)
- Fire protection installations (hose reel and fire alarm system)
- Electrical installations (external and internal installations)
- Sentul Galaxy Conventional Hall
- M&E Installations Consist Of :
- Air conditioning installations (dx-split units, dx-air handling units and mechanical ventilation)
- Fire protection installations (hose reel and fire alarm system)
- Plumbing & sanitary installations (external and internal installations)
- Electrical installations (electrical infrastructure and internal installations)
- Factory Complex for Infineon Technologies (M) Sdn. Bhd. (formerly known as Siemens Components Sdn. Bhd.) at Batu Berendam Free Trade Zone, Melaka
- Express Rail Link from Kuala Lumpur Sentral Station to Kuala Lumpur International Airport at Sepang for Siemens Electrical Engineering Sdn. Bhd.
- Extension of Factory blocks and upgrading of electrical distribution system for Koa Denko (M) Sdn. Bhd., Free Trade Zone, Melaka.
- Plastic Factory at Nilai, Negeri Sembilan and Skudai for Ralco Plastic Sdn. Bhd.
- The supply, delivery, installation, testing and commissioning of mechanical and electrical installations for Hewlett-Packard Sales (Malaysia) Sdn. Bhd. at Wisma Semantan.
- Meeting Facilities for Maxis Communication Berhad at 8"' Floor, Menara Maxis, KLCC, 50088 Kuala Lumpur
- Ampang Superbowl Bowling Center At Berjaya Times Square, Kuala Lumpur.
- Upgrading of M&E installations for ASTRO
- M&E installations for ASTRO AWANI (NDTV)
- Proposed fit out and refurbishment of the Ground Floor, front office, Technical Rooms, Newsroom, Studio, OB Garage and the Mezzanine Floor at Wisma Ali Bawal 2, Jalan Tandang, Selangor Darul Ehsan - ASTRO ARENA
- The Upgrading Of The M&E Installations at the Uplink Building at Measat, Cyberjaya.
- Proposed fit out and refurbishment of the Technical Room, Newsroom and Studio at KMA, City Plaza, IT-8 - IT9 & 10, Jin Gatot Subroto No. 44 Jakarta 12710 (Up to tender stage).
- Electrical installations for the Kvaerner/BASF Petronas Chemicals Sdn. Bhd.
- Ice Plant at Kawasan Perindustrian Selat Klang Utara Pelabuhan Klang for Jalan Pelabuhan, North Port for Hai San Ice Industries Sdn. Bhd.
- Al Rajhi Bank Branches
- Fitness Centre for Celebrity Fitness at Penang, Subang Parade, Bangsar
- SHELL - Cyberjaya
- SHELL - Wisma Chase Perdana
- Melaka Manipal Medical College for JVMC Corporation Sdn. Bhd.
- Melaka Manipal Medical College - Hostel Block
- Extension of Factory Phase 5 and 6 for TKR Manufacturing (M) Sdn. Bhd. at Kawasan Perindustrian Tangga Batu, Melaka.
- Upgrading works for DMIB Berhad
- Fibre Glass Plant at Bukit Raja Klang for Bradford Rockwool (M) Sdn. Bhd.
- Upgrading of the Existing Building Management System and UMBS at the Broadcast Building of the All Asia Broadcast Centre, Technology Park Malaysia, Bukit Jalil, 57000 Kuala Lumpur for ASTRO
- M&E infrastructure installation to upgrade the Base Building At Wisma SPK, No. 22 Jalan Sultan Ismail, Kuala Lumpur
- Electrical consultancy services for the proposed engineering, procurement, installation and commissioning for the AL Areen District Cooling Plant, Bahrain.
- Electrical consultancy services for the proposed engineering, procurement, installation and commissioning for building material Abu Dhabi, U.A.E. project.
- M&E consultancy services for Steelcase Global Shared Office, The Gardens, South Tower, Mid Valley City, Kuala Lumpur (Level 26 & Level 27)
- M&E for the proposed renovation works for I.T. Department at NEQ, all Asia Broadcast Centre, Technology Park, Malaysia.
- Proposed Data Centre at Ground Floor Office at all Asia Broadcast Centre, Technology Park, Malaysia.
- Design, construction and completion of proposed interior office at Level 45 with terrace, Menara Maxis, Kuala Lumpur.
- Rectification works of the air conditioning system at Daltron Data Centre at Waigani, NCD, Papua New Guinea.
- 5 storey block of flats for the Ministry of Defense housing project at Tangga Batu, Melaka on behalf of Bukit Rambai Development Sdn. Bhd.
- Condominium project at Happy Garden on behalf of Sakinas Sdn. Bhd.
- Hotel renovation works at Medan Tuanku, Kuala Lumpur for Dashrun Hotel.
- Proposed 216 Room Hotel in Lot 1509 to 1513 Lorong Haji Hussain Dua, Kuala Lumpur.
- Upgrading of Electrical Installations at Koperasi Polis DiRaja Malaysia Berhad Headquarters.
- 50 acre Recreational park for Majlis Perbandaran Melaka Bandaraya Bersejarah.
- Pasar Borong for Majlis Perbandaran Melaka Bandaraya Bersejarah.
- Renovation works for Public Swimming Pool for Majlis Perbandaran Melaka Bandaraya Bersejarah.
- Time Capsule 2020 for Majlis Perbandaran Melaka Bandaraya Bersejarah.
- Pasar Wilayah at Ayer Keroh Melaka for Majlis Bandaraya Melaka Bersejarah.
- Pasar Wilayah at Pantai Kundor Melaka for Majlis Perbandaran Melaka Bandaraya Bersejarah.
- Aquaculture project at Kuala Kerpan, Kedah.
- 11 blocks with a total of 300 units of walk up apartments including Dewan Sebaguna, Surau, Tadika and 8 units of shoplots for Langkawi Development Authority, Langkawi.
- 7 '/2 Storey apartment consisting of 17 units of high cost apartments with gymnasium, swimming pool for Messrs. Juara Dagang Sdn. Bhd. at Mukim Petaling, Wilayah Persekutuan.
- 150 units of medium cost apartments for Messrs. Ideal Heights Properties Sdn. Bhd. at Bukit Idaman, Mukim Batu, Gombak, Kuala Lumpur.
- 182 units of apartments for Messrs. Tim Development & Construction Sdn. Bhd. at Mukim Batu, Daerah Gombak, Selangor.
- 4 storey factory for Success Electronics & Transformer Manufacturer Sdn. Bhd.
- Development of Task Detailing Book for ESSO Development Malaysia Incorporated's Offshore Electrical Specialist.
- Technical Training for the upgrading of skills and knowledge for line Technicians and Engineers for Sankyo Precision (M) Sdn. Bhd.
- Design of electrical and communications systems for Olinco (M) Sdn. Bhd.
- Feasibility study of the existing mechanical ventilation installations for Menara Maxis.
- Feasibility study of the existing sanitary piping installations for Menara Maxis.
- Feasibility study of the mechanical and electrical installations for the Astro M3B and M3C project.
- Feasibility study and audit of the existing Chiller Plant Rooms (CPR1, CPR3, CPR4 & CPR5) for Texas Instruments Electronics Malaysia.
- Feasibility study and proposal for voltage sag mitigation for Texas Instruments Malaysia.
Electrical Supervision Services are currently being extended to the following organizations
- Asia Poly Industrial Sdn. Bhd.
- Bata (Malaysia) Sdn. Bhd.
- Badan Perhubungan UMNO
- Budimas Precision Sdn. Bhd.
- Benkert (M) Sdn. Bhd.
- Couture Homes Sdn. Bhd.
- Continental Sime Tyre PJ Sdn. Bhd.
- Deutsche Technoplast (M) Sdn. Bhd.
- Danone Dumex (Malaysia) Sdn. Bhd.
- Endeka Ceramics Sdn. Bhd.
- Enkei (Malaysia) Sdn. Bhd.
- ERL Maintenance Support SDn. Bhd.
- Goodway Rubber Industries Sdn. Bhd.
- Hai San Ice Industries Sdn. Bhd.
- Hunter Douglas Manufacturing (M) Sdn. Bhd.
- The Institution of Engineers, Malaysia.
- Infineon Technologies (Malaysia) Sdn. Bhd.
- Koperasi Polis DiRaja Malaysia Berhad.
- Kolej TAFE
- Koa Denko (M) Sdn. Bhd.
- Mission Food (M) Sdn. Bhd.
- Maruwa (M) Sdn. Bhd.
- Nadin Management Sdn. Bhd.
- Nadin Properties Sdn. Bhd. - MBF Building
- Ralco Plastic Sdn. Bhd.
- SCA Hygiene Malaysia Sdn. Bhd.
- Tatsumori (M) Sdn. Bhd.
- Transicoil (M) Sdn. Bhd.
- TDK (M) Sdn. Bhd.
- Texas Instruments (M) Sdn. Bhd.
- Vishay Semiconductor Malaysia Sdn. Bhd.
- YPC Malaysia Sdn. Bhd.